Filtered:
4104
   SiteTotal:
4104
Area | Sub-Area | Tcode | Description |
---|---|---|---|
QualityInspection | ResultRecording | QE05 | Change sample results |
BasicDataInPP | WorkCenter | CR01 | Create Work Center |
LogisticsEssentials | StorageLocation | MCBC | Storage location Analysis |
Purchasing | QuotaArrangement | MEQ3 | Display Quota Arrangement |
Project | ProjectPlanningBoard | CJ27 | Project planning board |
InventoryManagement | HandlingUnit | HUINV04 | Analysis of HU Phys. Inv. Documents |
Purchasing | PR | ME5R | Archived Purchase Requisitions |
Shipping | Picking | LT72 | Determine 2-step relevance |
QualityInspection | PhysicalSample | QPR4 | Confirm physical sample drawing |
QualityInspection | QualityLevel | QD33 | Delete quality level |
Project | ProjectAssorted | CJ20N | Project Builder |
Purchasing | MRP | OMDZ | C MD MRP Creation Indicator |
Interface | IDOC | BD30 | Distribute material object list |
Shipping | ShippingPoint | OVXD | Shipping Points |
ProjectFinancials | ActualPostingsInPS | KB44N | Reverse Manual Repostings of Revenue |
CapacityRequirementsPlanning | CapacityEvaluation | CM05 | Capacity plan.:Work center overload |
CapacityRequirementsPlanning | CapacityEvaluation | CMV4 | Delete value variable |
LongTermPlanning | PlanningRunInLTP | MS03 | Long-term plng: singl-itm, singl-lvl |
ProductionExecution | ProductionOrder | COOIS | Production Order Information System |
QualityControl | FlexibleAnalysesInQM | MCX7 | QIS: Create Evaluation Structure |