Filtered:
4140
   SiteTotal:
4140
| Area | Sub-Area | Tcode | Description |
|---|---|---|---|
| Purchasing | MRP | OMIX | Text: User Exit Planning Run |
| ShopFloorControl | PlantDataCollection | CI33 | Transfer of master data for PM |
| ProjectStructures | WBS | CN61 | Display change documents: Library Network |
| Purchasing | MRP | OM0O | Evaln Profile Ranges of Coverage |
| WMInvMgmt | MobileDataEntry | LM32 | Load Control - System Guide Load |
| PreventiveMaintenance | MaintenancePlan | IP00 | Maintenance Planning Menu |
| MasterDataInQM | QMWorkCenter | CRQ2 | Change work center |
| MasterDataInPS | StatisticalKeyFigures | KK02 | Change Statistical Figure |
| Purchasing | MRP | OPPE | Conversion Plnnd Order -> Prod.Order |
| WMInvMgmt | TransferOrder | LT1C | Confirm TO-Item Transport |
| ABAP | ALE | UPSC03 | Scenario and Recipient for Pack.Type |
| ProjectInformationSystem | IndividualOverviewsInPS | CN48N | Overview: Confirmations |
| MaterialMaster | MaterialValuation | OMWQ | C LIFO/FIFO Sample |
| WMInvMgmt | MobileDataEntry | LM03 | Put Away - by TO |
| ProductCostControlling | CostEstimation | CK83 | Print Cost Estimates in Background |
| Interface | IDOC | BD26 | Get Activity Type |
| Purchasing | PO | ME25 | Create PO with Source Determination |
| AssetAccounting | AssetMaster | AR01 | Call Asset List |
| SOP | SalesandOperationsPlanning | MC8G | Schedule Mass Processing |
| AssetAccounting | Depreciation | ABAA | Unplanned depreciation |