Filtered:
4140
   SiteTotal:
4140
| Area | Sub-Area | Tcode | Description |
|---|---|---|---|
| MaterialMaster | MaterialMaster | IH05 | Material structure |
| SOP | ProportionalFactors | MC9B | Calc. Proportions as in Pl.Hierarchy |
| OrganizationalStructure | Warehouse | EC09 | Org.Object Copier: Warehouse Number |
| Project | WBSElement | CJ13 | Display WBS Element |
| AccountsPayables | BillOfExchange | F-23 | Return Bill of Exchange Pmt Request |
| ABAP | SystemTrace | TU02 | Parameter Changes on this Instance |
| ABAP | Workflow | SWIA | Process Work Item As Administrator |
| ForeignTrade | ForeignTrade | VI09 | Change FT Data in Purchasing Doc. |
| Purchasing | PO | ME2B | POs by Requirement Tracking Number |
| LongTermPlanning | PlanningRunInLTP | MS01 | Long-Term Planning: Total Planning |
| QualityControl | StandardAnalysisInQM | MCQA | Call Up QM Standard Analyses |
| InventoryManagement | IMPhysicalInventory | MI05 | Change Inventory Count |
| Catalog | SelectedSet | QS54 | Maintain selected set |
| Interface | IDOC | BD15 | Open vendor |
| Purchasing | MRP | OM0F | Convert MDVM/MDVL for MRP Areas |
| ProjectFinancials | YearEndClosingInPS | CJCF | Carry Forward Project Commitments |
| InventoryManagement | InventoryControlling | MCBA | INVCO: Plant Analysis Selection |
| LogisticsGeneral | EarlyWarningSystem | MCYL | Exception Analysis: QM-IS |
| QualityPlanning | SampleDrawingProcedure | QPV2 | Maintain sample drawing procedure |
| LogisticsGeneral | BatchManagement | OMCE | Define Batch Level |