Filtered:
4140
   SiteTotal:
4140
| Area | Sub-Area | Tcode | Description |
|---|---|---|---|
| Project | ProjectCustomizing | OPSB | Cost Planning Profile |
| InventoryManagement | PhysicalInventoryInIM | MI35 | Batch Input: Post Zero Stock Balance |
| Purchasing | Vendor | FK02 | Change Vendor (Accounting) |
| BasisAdministration | ChangeAndTransportSystem | SE03 | Transport Organizer Tools |
| BasisAdministration | TableBuffer | AL12 | Display Table Buffer (Exp. Session) |
| Purchasing | MRP | MDW1 | Access MRP control program |
| CapacityRequirementsPlanning | CapacityLeveling | CM27 | Capacity level.: SFC indiv.cap.graph |
| Purchasing | RFQ | MN03 | Display Message: RFQ |
| ProjectFinancials | ActualPostingsInPS | FMWD | Approve Funds Transfer |
| Shipping | Packing | POP2 | Change Packing Instruction |
| Interface | IDOC | WE15 | Test Outbound Processing from MC |
| PreventiveMaintenance | MaintenancePlan | IP06 | Display Maintenance Item |
| Sales | ListingExclusion | VB03 | Display Material Listing/Exclusion |
| Interface | IDOC | BD33 | Distribute material variants (ALE) |
| LogisticsInvoiceVerification | ParkedDocument | FBV4 | Change Parked Document (Header) |
| MaterialMaster | MaterialMaster | MMP1 | Create Maintenance Assembly |
| Purchasing | PostingPeriod | OKP1 | Maintain Period Lock |
| QualityPlanning | SamplingProcedure | QDV2 | Change sampling procedure |
| MaterialMaster | MaterialMaster | MMVV | Change Centr. for Decentr. Shipping |
| EngineeringChangeManagement | ChangeMaster | CC04 | Display Product Structure |