Filtered:
4140
   SiteTotal:
4140
| Area | Sub-Area | Tcode | Description |
|---|---|---|---|
| QualityPlanning | ReferenceOperationSet_QM | QP11 | Create reference operation set |
| Sales | ItemProposal | VA53 | Display Item Proposal |
| PhysicalInventory | PhysicalInventoryAssorted | MI40 | Batch Input: Doc., Count and Diff. |
| InventoryManagement | Stock | MB5TD | Stock in Transit on Key Date |
| MaterialMaster | MaterialMaster | MMG1 | Create Returnable Packaging |
| EngineeringChangeManagement | ECMArchiving | CCAA | Change tables for archiving |
| WMPhysicalInventory | CountResults | LI16 | Cancel Physical Inventory Doc. Item |
| CapacityRequirementsPlanning | CapacityEvaluation | CM01 | Cap. planning, work center load |
| AuditManagement | AuditManagement | PLM_AUDIT_DISPLAY | Audit Component: Display |
| LongTermPlanning | EvaluationsInLTP | MS07 | Long-Term Plng: Material Overview |
| MaterialMaster | MaterialMaster | MMF1 | Create Finished Product |
| GeneralLedgerAccounting | GeneralLedger | F.04 | G/L: Create Foreign Trade Report |
| QualityInspection | ResultRecording | QE02 | Change characteristic results |
| BasisAdministration | Client | SCC7 | Post-Client Import Methods |
| ProductCostControlling | CostEstimation | CK86 | Costed Multilevel BOM |
| ProjectFinancials | PeriodEndClosingInPS | KKA0 | Maintain Cutoff Period |
| Purchasing | Service | ML52 | Change Conditions |
| Interface | IDOC | BD24 | Send Cost Elements |
| ProjectFinancials | ProjectCostPlanning | KKE1 | Add Base Planning Object |
| Interface | IDOC | WE41 | Process codes, outbound |