Filtered:
4140
   SiteTotal:
4140
| Area | Sub-Area | Tcode | Description |
|---|---|---|---|
| ProductCostControlling | CostingReporting | KKB5 | Costing Items for Material |
| PreventiveMaintenance | MaintenancePlan | IP02 | Change Maintenance Plan |
| WMInvMgmt | TransferOrder | LT1C | Confirm TO-Item Transport |
| MasterDataInQM | QualityAssuranceAgreement | QV01 | Create quality assurance agreement |
| PhysicalInventory | PhysicalInventoryDocument | MIAL | Inventory Documents: Read Archive |
| MaterialMaster | MaterialValuation | OMWL | C LIFO/FIFO Global Setting |
| ShopFloorControl | ProductionOrder | CO78 | Archiving orders |
| MaterialMaster | MaterialMaster | OMT3 | Customizing for the Material Master |
| MaterialMaster | MaterialValuation | MRN3 | Loss-Free Valuation |
| Kanban | Kanban | PK05 | PP Maintain Supply Area (Kanban) |
| WMInvMgmt | MobileDataEntry | LM25 | Unpack HU by Delivery |
| ProductCostControlling | MaterialLedger | CKMM_RUN | Multilevel Pr. Deter. for Cstg Run |
| ProjectFinancials | BudgetingInPS | CJ3B | Display Budget Document |
| BasisAdministration | UpgradeGeneral | ANST | Automated Note Search Tool |
| CapacityRequirementsPlanning | CapacityLeveling | CM22 | Capacity leveling:SFC planning table |
| AssetAccounting | AssetMaster | AS04 | Asset Changes |
| SOP | SalesandOperationsPlanning | MC74 | Transfer Mat. to Demand Management |
| WMInvMgmt | MobileDataEntry | LM46 | Pick and Pack by Delivery |
| ConfigurationsInQM | QMProcurementKey | QI05 | Mass maintenance QM procurement keys |
| TechnicalObjects | MeasuringPoints | IK08R | Change Reference Measuring Point |