Filtered:
4140
   SiteTotal:
4140
| Area | Sub-Area | Tcode | Description |
|---|---|---|---|
| QualityInspection | ResultRecording | QE51 | Results recording worklist |
| LogisticsGeneral | BatchManagement | OPLC | CondTab: Change (batchs, prod.) |
| BasicDataInPP | BOM | CS13 | Summarized BOM |
| Classification | Class | CL22N | Assign Class to Superior Classes |
| WMInvMgmt | WMPPInterface | OMK0 | Link to PP interface |
| GeneralLedgerAccounting | AccountDetermination | OBYC | C FI Table T030 |
| Project | WBSElement | CJSG | Generate WBS Element Group |
| Project | ProjectVersion | CJV5 | Delete simulation version |
| Shipping | ShipmentCosts | TK12 | Change condition (shipment costs) |
| Interface | IDOC | WE05 | IDOC list |
| Purchasing | MRP | OMDY | C MD Planning Run Abend |
| MaterialMaster | PackagingMaterial | MMW1 | Create Competitor Product |
| Sales | SalesActivity | VC01 | Create Sales Activity |
| VariantConfiguration | ConfigurationProfile | CLD1 | Distr. Configuration Profile (Matl) |
| MRP | MRPgroup | OPPR | Maintain MRP Group |
| PhysicalInventory | InventorySamplingProcedure | MIS1 | Create Sample-Based Phys. Inv. - ERP |
| MasterDataInPM | EquipmentTaskList | IA01 | Create Equipment Task List |
| Purchasing | PurInfoRecord | ME1B | Redetermine Info Record Price |
| Project | ProjectAssorted | CNMASSSTATUS | Mass Status change in Project System |
| Shipping | ShipmentCosts | TK14 | Create condition with ref. |