Filtered:
4104
   SiteTotal:
4104
Area | Sub-Area | Tcode | Description |
---|---|---|---|
Purchasing | MRP | OPPQ | C M MRP Plant Parameters for MRP |
WMInvMgmt | StorageBin | LS03N | Display Warehouse Bin (new) |
InventoryManagement | GoodsMovement | MB90 | Output Processing for Mat. Documents |
LogisticsGeneral | BatchManagement | OPLG | Batch determ.: Procedure for prod. |
PhysicalInventory | PhysicalInventoryDocument | MIV1 | Batch I.:PhInDoc f.Ret.Pack.at Cust. |
Purchasing | MRP | OMIU | Action Code - Planned Order Control |
Classification | Objects | CL6B | Object List |
DemandManagement | CustomerRequirements | MD83 | Display Customer Indep. Requirements |
Project | ProjectVersion | CJV3 | Display Project Version (Simulation) |
CapacityRequirementsPlanning | CapacityLeveling | CM36 | Capacity leveling: PI order graphic. |
ABAP | ALE | UPS04 | Copy ALE Distribution Unit |
VariantConfiguration | VariantTable | CU62 | Change Table Structure |
LongTermPlanning | SimulativePlannedOrder | MS12 | LTP: Change planned order |
BasisAdministration | ComputingCenterManagement | ST04 | DB Performance Monitor |
Purchasing | PO | ME80FN | General Evaluation of Purchasing Documents |
EngineeringChangeManagement | ChangeMaster | CC00 | Engineering Change Management Menu |
QualityPlanning | ReferenceOperationSet_QM | QP12 | Change reference operation set |
ABAP | BRFplus | BRFAPL01 | BRF: Create Application Class |
OverheadCostControlling | InternalOrder | KO8G | Act. Settlment: Int.-/Maint. Orders |
QualityInspection | InspectionLot | QA06 | Job overview: Periodic inspection |